Hartland Resource Management Group has been selected as the preferred proponent to design, build, partially finance, operate and maintain the Residuals Treatment Facility over a 20-year term for the Wastewater Treatment Project.
Residual solids from the McLoughlin Point Wastewater Treatment Plant will be piped to the Residuals Treatment Facility at Hartland Landfill, where they will be treated and turned into what are known as Class A biosolids.
The facility site is located within the footprint of the Hartland Landfill in Saanich, and was selected in 2013.
The Residuals Treatment Facility will use an anaerobic digestion process followed by a dryer process to produce a dried Class A biosolid. The ultimate use of these biosolids will be determined by a separate planning process undertaken by the CRD.